Opening the boiler house in Beregovo

Generator capacity 1.5 MW

Beregovo, Zakarpattya region;

Investment component - € 400 000;

The required amount of biofuel - 7500мper year;

Fuel: wood chips fuel;

Substitution of natural gas - 315 000м3 per year ;

Opening the boiler house in Tyachev

Generator capacity 1.25 MW

Tyachiv, Zakarpattya region;

Investment component - € 500 000;

The required amount of biofuel - 6000мper year;

Fuel: wood chips fuel;

Substitution of natural gas - 250 000мper year;

Kolbe Energy Park extends logging equipment

On Kolbe Energy today is one of the first companies who are beginning to carry out timber harvesting on modern European technologies in Ukraine. The company has acquired the advanced technique of the best producers of the world scale, namely harvester, consisting of a system of machines: excavator JCB JS 240 LC and harvester head PONSSE H7, which combined with its technical characteristics and are able to work with one set of performing a number of logging operations. Among these works: felling trees with a diameter up to 65cm clearance from the twigs, branches, bucking, moving them to storage sites.

Kolbe Energy has helped to install a playground in the Teresva village.

With the support of the company «Kolbe Energy», the holiday of Mother's Day on the territory of the clinic was opened a children's playground. Children's laughter, happy kids faces - just such a picture could be seen at the opening ceremony.

The event was attended by Deputy Chairman of the State Administration Tyachiv Fedor Stan, township head Oleksiy Vasiliy, director of the school Oksana Gritsik, as well as members of the district council.